congrats!
__________________
Philip Yiu Detailer's Domain E-mail: phil@detailersdomain.com Tel: 201-233-0003 Member's receive 10% off using DB as a promo code at checkout |
|
||||
|
Nope, still nothing new since the last round of pics. An inspector from the engineering company came by and said that everything looks good, but the drawings from the engineerd slab aren't done yet. Could be another two weeks. Are they busy or is it me? Once that is done, then we can pour. The same company is pouring that did the toll roads here, so it must be decent stuff!
|
|
||||
|
My apologies for the lack of updates. The engineering company took longer than expected to finalize the engineered slab in regards to the soil sample that was taken.
We made a few changes! 1) Instead of 18" deep, we went on to 24" deep 2) We put more rebar in, now every 12" 3) Instead of 1/4" steel, we replaced it with 1/2" steel! 4) Instead of regular concrete, tomorrow we'll pour heavy duty concrete. Needless to say, we should be able to park a locomotive in there after it's all said and done! Also, I decided to go with a single 16 foot centered door, NICE!!! ![]() ![]() ![]() |